Solar Photovoltaic Market Development Programme
Minimum loan for a project should be of Rs.5 lakhs for Direct User and Rs.10 lakhs for Intermediaries.
The manufacturers must provide a warranty for a minimum period of 2 years for the complete SPV system (including the battery) and a minimum 10 years for PV modules from the date of supply. Annual maintenance Contract (AMC) for the SPV Systems should be for a period of 5 years including the warranty period.
Yes, soft loans are available at an interest rate of 5% (individuals and other organizations) per annum and 7% (commercial borrowers who can claim depreciation benefits) and also Financial intermediaries who borrow funds from JREDA for on - lending at 5% or 7% rate of interest will be charged an interest rate of 2.5% or 4.5% respectively by JREDA. Such intermediaries will not be able to claim depreciation benefit and the on-lending arrangement will not be treated as a lease arrangement, through Jharkhand Renewable Energy Development Agency Limited (JREDA). The minimum amount of soft loan will be Rs. 5 Lakhs for Direct User and Rs.10 Lakhs for Intermediaries. The principal with the interest is repayable in 6 years (including one year moratorium) starting at the end of first year of sanction of the loan.
An individual, non-governmental organization, cooperative society, corporate body, institution and Govt. Dept. etc.
Solar cell is a primary device for Solar Photovoltaic systems since it converts solar radiation into electricity. Solar PV cells are made by fine sheets of silicon wafers, cutted in the required shape. The technology is mainly based on Monocrystalline silicon or polycrystalline technology. Number of such SPV cells are coupled in series and (or) parallel connection to design a SPV Module of required Power. These modules can be further coupled to form SPV array, to get desired power output to run the electrical appliances such as solar home systems, street lighting systems, small capacity SPV power plants, solar generators, building integrated photovoltaic (BIPV) systems and solar lanterns. The Photovoltaic Array converts the solar energy into electricity, which is used for running any electrical appliances or can stored in a battery. The system components of SPV Water Pumping System are:
The Photovoltaic Array converts the solar energy into electricity, which is used for running the electrical equipments. The electricity produced either stored in the Battery bank or directly used for running the electrical equipment.
A SPV system consists of a Photovoltaic Array mounted on a Stand, Batteries, CCU, and other required equipments depending upon the size and requirement of power and current.
S. No. |
SPV Systems |
Central Subsidy |
Service Charge(Rs) |
|
a) |
Solar Home Systems | 50% of ex. Works Cost. Subject to maximum of |
North-eastern Region 90% of ex. Works subject to a Max. of |
|
18W Module, 1 light |
3000 | 5000 | 200 | |
37W module , 2 lights 1x37Wp PV module under STC, 2x CFL ( 9w/11w), Battery: 1x12V ,40AHTubular Plate Low maintenance type lead Acid Battery Control electronics,module mounting hardware,battery box,inter-connecting Wires/cables, switches,operation, instruction And maintenance manual) |
5500 | 10,000 | 200 | |
74W Module, 2 lights, 1 fan |
10,000 | 18,000 | 200 | |
74W Module, 4 lights (2x37Wp PV module under STC, 4x CFL ( 9w/11w), Battery: 1x12V,75 AH Tubular Plate Low maintenance type lead Acid Battery Control electronics, module mounting Hardware, battery box, inter-connecting Wires/cables, switches, operation, instruction And maintenance manual) |
10,000 | 18,000 | 200 | |
b) | Street Lighting System | 11,000 | 20,000 | -Nil- |
c) | Power plants & other community systems | 1,80,000 PV array capacity |
3,50,000/KWp of PV array capacity |
10,000/- (power plants) |
d) | Solar Generators | 40% with an upper limit of Rs.40.000/ per generator |
||
150 Wp PV Cap. | 18,000 Approx | |||
300 Wp PV Cap | 36,000 Approx | |||
450 Wp PV Cap | 40,000 Approx | |||
600 Wp PV Cap | 40,000 Approx |
For Solar Lantern >>
For Solar Home Systems>>
Model | Component | Specifications | Average Hours of Operation / Day |
1. |
PV Module | 1x18 Wp under STC | 1 Light, 3 - 4 Hrs. |
Lamp | 1xCFL (9W/11W) | ||
Battery | 1x12V, 20AH. Tubular Plate. | ||
Other Components |
Control electronics. Module mounting hardware. Battery box. Inter connecting wires. Swiches. Operation, instruction and maintenance manual. |
||
2. |
PV Module | 1x37 Wp under STC | 1 Light - 1 - 2 Hrs., 1 Fan - 1-2 Hrs. |
Lamp | 1xCFL (9W/11W) | ||
Battery | 1x12V, 20AH. Tubular Plate. | ||
Other Components |
Control electronics. Module mounting hardware. Battery box. Inter connecting wires. Swiches. Operation, instruction and maintenance manual. |
||
3. |
PV Module | 1x37 Wp under STC | 1 Light - 1 - 2 Hrs., 1 Fan - 1-2 Hrs. |
Lamp | 1xCFL (9W/11W) | ||
Fan | 1xDC Fan (with wattage less than 20W) | ||
Battery | 1x12V, 40AH. Tubular Plate. | ||
Other Components |
Control electronics. Module mounting hardware. Battery box. Inter connecting wires. Swiches. Operation, instruction and maintenance manual. |
||
4. |
PV Module | 2x37 Wp or 1x74 Wp under STC | 2 Light - 2 - 3 Hrs., 1 Fan - 2-3 Hrs. |
Lamp | 2xCFL (9W/11W) | ||
Fan | 1xDC Fan (with wattage less than 20W) | ||
Battery | 1x12V, 75AH. Tubular Plate. | ||
Other Components |
Control electronics. Module mounting hardware. Battery box.Inter connecting wires. Swiches. Operation, instruction and maintenance manual. |
||
5. |
PV Module | 2x37 Wp or 1x74 Wp under STC | 4 Lights - 3-4 Hrs. |
Lamp | 4xCFL (9W/11W) | ||
Battery | 1x12V, 75AH. Tubular Plate. | ||
Other Components |
Control electronics. Module mounting hardware. Battery box. Inter connecting wires. Switches. Operation, instruction and maintenance manual. |
Notes : All models will have a socket to provide power for 12V DC TV set, which is purchased separately. Small white LED may be provided as an optional feature, with an independent switch.
For Street Lighting Systems:
Model |
Component |
Specification |
|
Duty Cycle | System should be designed to automatically switch ON at dusk, operate throughout night and automatically switch OFF at down. |
PV Module | 1x75 Wp or 2x37 Wp. Vop 16.4 V, Voc 21 V. | |
Lamp | 11 W CFL, either 4 - Pin or 2 - Pin Type with light output of 900 /- 5% lumens. | |
Battery | 12V, 75AH. Tubular Plate. | |
Other Components | Control electronics. Module mounting hardware. Battery box. Inter connecting wires. Switches. Operation, instruction and maintenance manual. |
For Solar Generators:
Model |
PV Capacity |
Estimated Cost |
Model-І | 150 Wp | Rs. 45,000/- |
Model-ІІ | 300 Wp | Rs. 90,000/- |
Model-ІІ | 450 Wp | Rs. 1,35,000/- |
Model-ІV | 600 Wp | Rs. 1,80,000/- |
Notes: Subsidy of 40% with an upper limit of Rs. 40,000/- will be provided on each generator. User will also be eligible for loans on the balance cost of the solar generators. Subsidy will be released directly by MNES to the Manufactures.
S. No. | Feature | Implementation through JREDA |
1. |
Eligible categories of Beneficiaries |
All categories of users including intermediaries and commercial organizations |
2. |
Rate of Interest |
7% (commercial borrowers who can claim depreciation benefits) 5% (individuals and other organizations) |
3. |
Loan period |
3 Yrs |
4. |
Moratorium |
1 Year |
5. |
Amount of loan |
80% of the cost of the project |
6. |
Upper Limits for a loan |
No Limit |
7. |
Service Charges |
1% of the loan disbursed |
8. |
System Covered |
All types of SPV Systems except solar pumps. Loans will not be provided at subsidized rates for systems that are available with capital subsidy. With the exception of solar generators for which both subsidies and soft loans will be available. |
9. |
Eligible Suppliers |
Only those SPV systems and power plants, which confirm to the MNES specifications & guidelines for 2001 - 02 or 2002 - 03 programmes and have obtained test certificates form SEC / Other Authorized Test Centers will be eligible for supply and other benefits under this scheme . |